Floor Inspection
The other night I laid out the piers for thebike room addition using a laser level to
line everything up.
(You can see the laser lines and note how
unlevel the floor of the old shed is,... no surprise there)
The next morning I built the sub-floor and
Put down 0.75" tongue and groove plywood.Later when the inspectors came out,...
Uschi headed right under to check for structural integrity.Sunday, August 29, 2010
Night Build
Shack annex construction has been going late into the night, and this has been keeping the boys from their usual 16+ hour napping routine. They are so excited, they have doubled their food consumption and demand full inspections of the construction every day. They can watch from the kennel, or...Saturday, August 28, 2010
Looking For Adventure
You better not swat your dad.
V grabbed a rafter as he came down andclung to it,... I had to pull him off.
Friday, August 27, 2010
Inspector Swirls
Uschi, you should never stand on the top step of a ladder,...U makes his move to the light then the roof.
The old shed looks pretty shabby compared to the new addition,...
I like it up here !!
I'm ready to come down now,....